US 12 over DITCH

0.5 MI E OF JCT TH 59 · County 151, Minnesota · Built 1971 · 2 Lanes · 1,318 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
91229
Year Built
1971
Length
7.5 m (24.6 ft)
Max Span
2.9 m
Lanes
2
Daily Traffic
1,318
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.