MN 55 over US 52 NB
AT THE W JCT TH 55 · County 037, Minnesota · Built 1958 · 2 Lanes · 6,400 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
44.765044, -93.033664
This bridge is in worse condition than 98.4% of bridges in County 037. The average bridge in Minnesota is 0 years old; this one is 68 years old.
Nearby Bridges
Bridge Details
- Structure #
- 9110
- Year Built
- 1958
- Length
- 95.7 m (314 ft)
- Max Span
- 29.3 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 6,400
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.