MSAS 115 over I 494

0.5 MI W OF JCT TH 77 · County 053, Minnesota · Built 1959 · 2 Lanes · 10,232 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
9080
Year Built
1959
Length
56.6 m (185.7 ft)
Max Span
17.8 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
10,232
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$901,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.