I 94 over RED RIVER;STR
0.6 MI W OF JCT TH 75 · County 027, Minnesota · Built 1958 · 3 Lanes · 34,455 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
46.847764, -96.780558
This bridge is in worse condition than 79.9% of bridges in County 027. The average bridge in Minnesota is 0 years old; this one is 68 years old.
Nearby Bridges
INTERSTATE 94 over RED RIVER OF THE NORTH
Built 1959
INTERSTATE 94 over RED RIVER OF THE NORTH
Built 1959
I 94 over RED RIVER;STR
Built 1958
INTERSTATE 94 over 5TH ST SEPARATION
Built 1993
US 75 over I 94
Built 2000
US 75 over I 94
Built 2000
INTERSTATE 94 over US 81
Built 1993
MSAS 126 over I 94
Built 1973
US HIGHWAY 10 over RED RIVER OF THE NORTH
Built 2004
US 10 over RED R OF THE N; 3RD ST
Built 2003
Bridge Details
- Structure #
- 9066
- Year Built
- 1958
- Reconstructed
- 1992
- Length
- 396 m (1299.2 ft)
- Max Span
- 36.9 m
- Width
- 17.8 m (58.4 ft)
- Lanes
- 3
- Daily Traffic
- 34,455
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.