CR 99 over STREAM
2.1 MI S OF JCT TH 30 · County 033, Minnesota · Built 1958 · 2 Lanes · 63 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 3 | Serious |
Location
44.020208, -94.999575
This bridge is in worse condition than 96% of bridges in County 033. The average bridge in Minnesota is 0 years old; this one is 68 years old.
Nearby Bridges
T 62 over STREAM
Built 1914
CSAH 29 over STREAM
Built 2013
CR 99 over N FK WATONWAN RIVER
Built 1968
T 129 over N FK WATONWAN RIVER
Built 1980
T 98 over WATONWAN RIVER
Built 1981
T 62 over WATONWAN RIVER
Built 2004
T 61 over WATONWAN RIVER
Built 2000
CR 29 over N FK WATONWAN RIVER
Built 1962
CR 99 over WATONWAN RIVER
Built 1977
T 198 over WATONWAN RIVER
Built 2021
Bridge Details
- Structure #
- 89528
- Year Built
- 1958
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 63
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $270,000,000
- Total Project Cost
- $300,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.