CR 112 over E FK BLUE EARTH RIVER
0.3 MI E OF JCT CSAH 19 · County 043, Minnesota · Built 1960 · 2 Lanes · 30 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.586756, -93.882686
This bridge is in worse condition than 84.1% of bridges in County 043. The average bridge in Minnesota is 0 years old; this one is 66 years old.
Nearby Bridges
CSAH 19 over E FK BLUE EARTH RIVER
Built 1973
CR 112 over DITCH
Built 1942
T 15 over CO DITCH #44
Built 2019
CSAH 19 over DITCH
Built 1951
CSAH 21 over E FK BLUE EARTH RIVER
Built 2021
T 49 over E FK BLUE EARTH RIVER
Built 1978
T 185 over E FK BLUE EARTH RIVER
Built 1973
CR 114 over E FK BLUE EARTH RIVER
Built 1977
CSAH 17 over COON CREEK (JD 13)
Built 2024
CSAH 23 over E FK BLUE EARTH RIVER
Built 2015
Bridge Details
- Structure #
- 89200
- Year Built
- 1960
- Length
- 15 m (49.2 ft)
- Max Span
- 14.2 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 30
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $530,000,000
- Total Project Cost
- $650,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.