CR 931 over STURGEON RIVER
0.8 MI N OF JCT CSAH22 · County 137, Minnesota · Built 1919 · 1 Lanes · 5 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
47.79415, -92.933764
This bridge is in worse condition than 94.9% of bridges in County 137. The average bridge in Minnesota is 0 years old; this one is 107 years old.
Nearby Bridges
CR 923 over STREAM
Built 1985
CR 356 over STURGEON RIVER
Built 2016
CR 356 over STREAM
Built 1947
CR 356 over STREAM
Built 1947
UT 921 over STURGEON RIVER
Built 1986
CSAH 22 over STURGEON RIVER
Built 2015
CR 492 over STURGEON RIVER
Built 2011
CSAH 22 over SAND CREEK
Built 1939
CSAH 107 over STURGEON RIVER
Built 1995
CSAH 82 over GILMORE CREEK
Built 2016
Bridge Details
- Structure #
- 88796
- Year Built
- 1919
- Length
- 43.3 m (142.1 ft)
- Max Span
- 27.7 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 5
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $900,000,000
- Total Project Cost
- $999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.