MN 4 over STREAM

5.8 MI N OF ST JAMES · County 165, Minnesota · Built 1953 · 2 Lanes · 893 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
8832
Year Built
1953
Length
10 m (32.8 ft)
Max Span
3 m
Lanes
2
Daily Traffic
893
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$188,000,000
Total Project Cost
$109,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.