MN 30 over STREAM

7.0 MI E OF JCT TH 15 · County 013, Minnesota · Built 1954 · 2 Lanes · 431 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
8805
Year Built
1954
Length
6.8 m (22.3 ft)
Max Span
3.1 m
Lanes
2
Daily Traffic
431
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$64,000,000
Total Project Cost
$84,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.