MN 23 over STREAM

2.9 MI S OF JASPER · County 133, Minnesota · Built 1953 · 2 Lanes · 1,725 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
8798
Year Built
1953
Length
6.8 m (22.3 ft)
Max Span
3 m
Lanes
2
Daily Traffic
1,725
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$78,000,000
Total Project Cost
$73,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.