MN 30 over STREAM

1.6 MI NE OF STORDEN · County 033, Minnesota · Built 1948 · 2 Lanes · 751 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
8662
Year Built
1948
Length
6.9 m (22.6 ft)
Max Span
3 m
Lanes
2
Daily Traffic
751
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$65,000,000
Total Project Cost
$93,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.