CSAH 2 over PINE CREEK

0.6 MI NW OF S CO LINE · County 169, Minnesota · Built 2004 · 2 Lanes · 85 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.852986, -91.804236

This bridge is in worse condition than 50.2% of bridges in County 169. The average bridge in Minnesota is 0 years old; this one is 22 years old.

Nearby Bridges

Bridge Details

Structure #
85553
Year Built
2004
Length
30.3 m (99.4 ft)
Max Span
11.3 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
85
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$348,000,000
Total Project Cost
$1,000