T 163 over RUSH CREEK

1.6 MI S OF JCT CSAJ 25 · County 169, Minnesota · Built 2005 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

43.937314, -91.861192

This bridge is in worse condition than 50.2% of bridges in County 169. The average bridge in Minnesota is 0 years old; this one is 21 years old.

Nearby Bridges

Bridge Details

Structure #
85548
Year Built
2005
Length
42.4 m (139.1 ft)
Max Span
13.4 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$471,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.