T 570 over BOIS DE SIOUX RIVER
AT THE ND; MN STATE LINE · County 167, Minnesota · Built 2003 · 2 Lanes · 10 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.094514, -96.556611
This bridge is in worse condition than 78.6% of bridges in County 167. The average bridge in Minnesota is 0 years old; this one is 23 years old.
Nearby Bridges
COUNTY HIGHWAY over BOIS DE SIOUX RIVER
Built 2003
CSAH 9 over RABBIT RIVER
Built 1989
T 124 over JUD DITCH # 11
Built 1945
T 132 over RABBIT RIVER
Built 2018
MN 55 over BOIS DE SIOUX RIVER
Built 1961
ND HIGHWAY 11 over BOIS DE SIOUX RIVER
Built 1961
US 75 over CO DITCH # 25
Built 1988
US 75 over RABBIT RIVER
Built 2023
MN 55 over JUD DITCH # 11
Built 2022
T 132 over JUD DITCH # 11 BR # 10
Built 2016
Bridge Details
- Structure #
- 84531
- Year Built
- 2003
- Length
- 44.5 m (146 ft)
- Max Span
- 14.6 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $553,000,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.