T 74 over ST JAMES CREEK

0.4 MI W OF JCT CR 112 · County 165, Minnesota · Built 2020 · 2 Lanes · 48 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

44.051128, -94.557522

This bridge is in worse condition than 53.6% of bridges in County 165. The average bridge in Minnesota is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
83553
Year Built
2020
Length
29.9 m (98.1 ft)
Max Span
10.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
48
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.