MN 95 over OBRIEN TR N

2.5 MI S OF JCT TH 97 · County 163, Minnesota · Built 1975 · 2 Lanes · 3,357 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
82018
Year Built
1975
Length
27.1 m (88.9 ft)
Max Span
25.9 m
Width
15.3 m (50.2 ft)
Lanes
2
Daily Traffic
3,357
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$591,000,000
Total Project Cost
$468,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.