T 149 over STREAM

2.1 MI E OF JCT TH 71 · County 159, Minnesota · Built 2023 · 2 Lanes · 49 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
80J27
Year Built
2023
Length
8.3 m (27.2 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
49
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.