CSAH 1 over BOOT CREEK

1.5 MI E OF JCT CR66 · County 161, Minnesota · Built 1931 · 2 Lanes · 172 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
7596
Year Built
1931
Length
10.2 m (33.5 ft)
Max Span
3.2 m
Lanes
2
Daily Traffic
172
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$144,000,000
Total Project Cost
$195,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.