T 79 over S BR TWO RIVERS

1.9 MI W OF JCT CSAH 9 · County 145, Minnesota · Built 1997 · 2 Lanes · 36 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
73J02
Year Built
1997
Length
9 m (29.5 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
36
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.