MN 55 over CP RAIL

3.1 MI W OF JCT TH 15; 55 · County 145, Minnesota · Built 2005 · 2 Lanes · 3,993 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
73031
Year Built
2005
Length
65.7 m (215.6 ft)
Max Span
21.2 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
3,993
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.