MN 15 over BNSF RR

0.6 MI N OF JCT TH 23 · County 145, Minnesota · Built 1987 · 2 Lanes · 19,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

45.562033, -94.205475

This bridge is in worse condition than 47.8% of bridges in County 145. The average bridge in Minnesota is 0 years old; this one is 39 years old.

Nearby Bridges

Bridge Details

Structure #
73025
Year Built
1987
Length
68.2 m (223.8 ft)
Max Span
34.4 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
19,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$692,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.