CSAH 25 over MID BR RUSH R (CD 23B)

0.8 MI W OF JCT TH 15 · County 143, Minnesota · Built 2017 · 2 Lanes · 205 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
72J69
Year Built
2017
Length
9.2 m (30.2 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
205
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.