CSAH 5 over W BR WARROAD RIVER

2.1 MI N OF CO LINE · County 135, Minnesota · Built 1958 · 2 Lanes · 155 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
7229
Year Built
1958
Length
17.4 m (57.1 ft)
Max Span
5.8 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
155
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$216,000,000
Total Project Cost
$241,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.