CSAH 5 over N FK CROW RIVER
1.7 MI NW OF JCT CR125 · County 171, Minnesota · Built 1956 · 2 Lanes · 968 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
45.126428, -94.114525
This bridge is in worse condition than 78.4% of bridges in County 171. The average bridge in Minnesota is 0 years old; this one is 70 years old.
Nearby Bridges
T 413 over N Fk Crow River
Built 2000
CSAH 4 over N FK CROW RIVER
Built 1989
CSAH 6 over N FK CROW RIVER
Built 2005
T 643 over N FK CROW RIVER
Built 1985
CSAH 35 over N FK CROW RIVER
Built 2013
T 118 over N Fk Crow River
Built 2001
CSAH 7 over N FK CROW RIVER
Built 1940
T 413 over BNSF RR
Built 1950
CSAH 8 over N FK CROW RIVER
Built 1969
CSAH 3 over N FK CROW RIVER
Built 1976
Bridge Details
- Structure #
- 7164
- Year Built
- 1956
- Length
- 38.7 m (127 ft)
- Max Span
- 7.6 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 968
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $450,000,000
- Total Project Cost
- $630,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.