CSAH 21 over PRIOR LAKE
1.4 MI NW OF JCT TH 13 · County 139, Minnesota · Built 1991 · 4 Lanes · 18,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.718983, -93.43575
This bridge is in worse condition than 54.3% of bridges in County 139. The average bridge in Minnesota is 0 years old; this one is 35 years old.
Nearby Bridges
M 99 over PRIOR LAKE
Built 1986
MSAS 120 over CREEK
Built 2006
IRR BIA RTE 0001 over SHAKOPEE DRAINAGE
Built 2005
MSAS 104 over CREDIT RIVER
Built 2007
M 632 over UNNAMED
Built 2010
MSAS 116 over STREAM
Built 2007
CSAH 21 over UNNAMED
Built 2009
CSAH 17 over CSAH 42 (140TH ST NW)
Built 2011
M 448 over CREDIT RIVER
Built 2014
M 319 over EAGLE CREEK
Built 1996
Bridge Details
- Structure #
- 70517
- Year Built
- 1991
- Length
- 31.5 m (103.3 ft)
- Max Span
- 12.3 m
- Width
- 20.8 m (68.2 ft)
- Lanes
- 4
- Daily Traffic
- 18,000
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.