T 1438 over PELICAN RIVER

0.7 MI E OF JCT TH 53 · County 137, Minnesota · Built 2023 · 2 Lanes · 49 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

48.033731, -92.819717

This bridge is in worse condition than 36.6% of bridges in County 137. The average bridge in Minnesota is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
69A78
Year Built
2023
Length
26.5 m (86.9 ft)
Max Span
25.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
49
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.