CON 3744 over I 35;SB OFF RAMP

2.3 MI NE OF JCT TH 535 · County 137, Minnesota · Built 1987 · 1 Lanes · 4,600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 7 Good

Location

46.789864, -92.09285

This bridge is in worse condition than 48.5% of bridges in County 137. The average bridge in Minnesota is 0 years old; this one is 39 years old.

Nearby Bridges

Bridge Details

Structure #
69817
Year Built
1987
Length
171 m (561 ft)
Max Span
46.7 m
Width
8.1 m (26.6 ft)
Lanes
1
Daily Traffic
4,600
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.