T 322 over CD # 7

0.9 MI N OF JCT TH 11 · County 135, Minnesota · Built 2010 · 2 Lanes · 39 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
68J35
Year Built
2010
Length
9.1 m (29.9 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
39
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.