1.1 MI S OF JCT CSAH 26 · County 135, Minnesota · Built 1959 · 2 Lanes · 130 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
48.804742, -96.184342
This bridge is in worse condition than 74.6% of bridges in County 135. The average bridge in Minnesota is 0 years old; this one is 67 years old.
Nearby Bridges
T 57 over STATE DITCH # 95;LAT 1
Built 1985
T 199 over STATE DITCH # 95;LAT 1
Built 1988
CR 149 over LAT.1 S.D95
Built 2012
CR 103 over SD 95
Built 2014
T 207 over STATE DITCH # 95;LAT 1
Built 1985
T 881 over STATE DITCH # 95;LAT 1
Built 1978
T 209 over STATE DITCH # 95;LAT 1
Built 1978
T 182 over STATE DITCH # 95;LAT 1
Built 1978
T 208 over STATE DITCH # 72
Built 2008
T 179 over STATE DITCH # 95; LAT #1
Built 1996
Bridge Details
- Structure #
- 68501
- Year Built
- 1959
- Length
- 9.4 m (30.8 ft)
- Max Span
- 9.1 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 130
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $105,000,000
- Total Project Cost
- $150,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.