MN 30 over DES MOINES RIVER

1.5 MI E OF CURRIE · County 101, Minnesota · Built 1952 · 2 Lanes · 1,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

44.065642, -95.646239

This bridge is in worse condition than 93.3% of bridges in County 101. The average bridge in Minnesota is 0 years old; this one is 74 years old.

Nearby Bridges

Bridge Details

Structure #
6782
Year Built
1952
Length
19.1 m (62.7 ft)
Max Span
18.3 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
1,200
Material
Concrete
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$271,000,000
Total Project Cost
$217,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.