MN 40 over DITCH

3.5 MI S OF JCT TH 119 · County 073, Minnesota · Built 1949 · 2 Lanes · 1,514 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 7 Good

Location

45.029292, -96.062597

This bridge is in worse condition than 85.6% of bridges in County 073. The average bridge in Minnesota is 0 years old; this one is 77 years old.

Nearby Bridges

Bridge Details

Structure #
6706
Year Built
1949
Length
8.2 m (26.9 ft)
Max Span
7.3 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
1,514
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$78,000,000
Total Project Cost
$93,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.