T 98 over BEAVER CREEK

0.5 MI W OF JCT TH 71 · County 129, Minnesota · Built 2005 · 2 Lanes · 59 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
65J34
Year Built
2005
Length
9.7 m (31.8 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
59
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$122,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.