T 77 over JUD DITCH # 15

1.3 MI E OF JCT TH 4 · County 129, Minnesota · Built 2000 · 2 Lanes · 120 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
65J03
Year Built
2000
Length
11.6 m (38.1 ft)
Max Span
5.2 m
Lanes
2
Daily Traffic
120
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$179,000,000
Total Project Cost
$189,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.