CR 65 over CO DITCH #63

1.0 N OF JCT TH 212 · County 129, Minnesota · Built 2020 · 2 Lanes · 155 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
65J02
Year Built
2020
Length
9.7 m (31.8 ft)
Max Span
4.5 m
Lanes
2
Daily Traffic
155
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.