CSAH 19 over BIRCH COULEE CREEK

0.6 MI E OF JCT TH 71 · County 129, Minnesota · Built 1960 · 2 Lanes · 160 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
65513
Year Built
1960
Length
9.1 m (29.9 ft)
Max Span
8.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
160
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$220,000,000
Total Project Cost
$237,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.