CSAH 30 over W BR SUNRISE RIVER
IN STACY · County 025, Minnesota · Built 1949 · 2 Lanes · 5,200 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
45.394739, -92.983328
This bridge is in worse condition than 85.2% of bridges in County 025. The average bridge in Minnesota is 0 years old; this one is 77 years old.
Nearby Bridges
M 4 over W BR SUNRISE RIVER
Built 1925
CSAH 19 over I 35
Built 1967
M 16 over W BR SUNRISE RIVER (JD #
Built 1991
CSAH 36 over SUNRISE RIVER
Built 2015
CR 77 over SUNRISE RIVER
Built 2012
CSAH 19 over SUNRISE RIVER
Built 2013
T 1197 over W BRANCH SUNRISE RIVER
Built 1964
M 221 over UPPER SUNRISE RIVER
Built 2023
CSAH 30 over S BR SUNRISE RIVER
Built 1948
CSAH 17 over I 35
Built 2006
Bridge Details
- Structure #
- 6488
- Year Built
- 1949
- Length
- 8.2 m (26.9 ft)
- Max Span
- 3.7 m
- Lanes
- 2
- Daily Traffic
- 5,200
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $86,000,000
- Total Project Cost
- $73,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.