T 73 over SLEEPY EYE CREEK

0.5 MI S OF JCT CR 66 · County 127, Minnesota · Built 2019 · 2 Lanes · 49 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
64593
Year Built
2019
Length
22.6 m (74.1 ft)
Max Span
8.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
49
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.