US 53 over MILLER CREEK

0.3 MI NE OF SKYLINE DR · County 137, Minnesota · Built 1940 · 4 Lanes · 19,124 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
6395
Year Built
1940
Length
6.7 m (22 ft)
Max Span
6.1 m
Lanes
4
Daily Traffic
19,124
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$84,000,000
Total Project Cost
$79,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.