MN 25 over PLATTE RIVER

8.5 MI N OF PIERZ · County 097, Minnesota · Built 1938 · 2 Lanes · 1,483 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
6321
Year Built
1938
Length
12.2 m (40 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
1,483
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$202,000,000
Total Project Cost
$51,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.