US 218 over STREAM

1.9 MI S OF N JCT TH 30 · County 039, Minnesota · Built 1929 · 2 Lanes · 4,200 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
6305
Year Built
1929
Length
10.1 m (33.1 ft)
Max Span
4.9 m
Lanes
2
Daily Traffic
4,200
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$253,000,000
Total Project Cost
$223,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.