I 94 over Fairview Avenue
0.4 MI W OF JCT TH 51 · County 123, Minnesota · Built 1967 · 8 Lanes · 134,387 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
44.951806, -93.176608
This bridge is in worse condition than 68% of bridges in County 123. The average bridge in Minnesota is 0 years old; this one is 59 years old.
Nearby Bridges
M 183 over N FAIRVIEW AVE
Built 1965
MSAS 181 over I 94
Built 1966
MN 51 over I 94
Built 1962
MSAS 120 over I 94
Built 1966
PVT 659 over ALLIANZ STADIUM DOCK
Built 2018
MSAS 257 over I 94; EB ENT RAMP
Built 1964
MSAS 233 over I 94
Built 1968
MSAS 191 over AYD MILL RD; CP RAIL
Built 1993
MSAS 233 over CP RAIL
Built 1967
MSAS 145 over I 94
Built 1964
Bridge Details
- Structure #
- 62847
- Year Built
- 1967
- Length
- 44 m (144.4 ft)
- Max Span
- 12.2 m
- Width
- 41.8 m (137.1 ft)
- Lanes
- 8
- Daily Traffic
- 134,387
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $217,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.