I 94 over TH 280 SB

AT THE JCT TH 94; 280 · County 123, Minnesota · Built 1967 · 3 Lanes · 86,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

44.960406, -93.20275

This bridge is in worse condition than 68% of bridges in County 123. The average bridge in Minnesota is 0 years old; this one is 59 years old.

Nearby Bridges

Bridge Details

Structure #
62812
Year Built
1967
Length
55 m (180.4 ft)
Max Span
21.5 m
Width
18.2 m (59.7 ft)
Lanes
3
Daily Traffic
86,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.