MSAS 188 over AYD MILL RD; CP RAIL

AT THE JCT AYD MILL RD · County 123, Minnesota · Built 1903 · 2 Lanes · 7,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
62505
Year Built
1903
Length
66.5 m (218.2 ft)
Max Span
27.7 m
Width
17.8 m (58.4 ft)
Lanes
2
Daily Traffic
7,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.