US 52 over UP RR; EATON ST

0.2 MI N OF JCT TH 56 · County 123, Minnesota · Built 1965 · 6 Lanes · 66,460 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
62026
Year Built
1965
Reconstructed
2010
Length
176.9 m (580.4 ft)
Max Span
46.2 m
Width
31 m (101.7 ft)
Lanes
6
Daily Traffic
66,460
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.