US 52 over UP RR; EATON ST
0.2 MI N OF JCT TH 56 · County 123, Minnesota · Built 1965 · 6 Lanes · 66,460 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
44.931486, -93.071536
This bridge is in worse condition than 68% of bridges in County 123. The average bridge in Minnesota is 0 years old; this one is 61 years old.
Nearby Bridges
US 52 over Concord St (TH 156)
Built 1972
MSAS 139 over Robert Street (952A)
Built 1930
MN 3 over UP RR
Built 1977
US 52 over Plato Blvd (CSAH 40)
Built 1967
MSAS 282 over US 52 (Lafayette)
Built 1973
MN 3 over MISSISSIPPI RIVER; RR
Built 1926
US 52 over MISS R RR; STREETS
Built 2010
US 52 over MISS R RR; STREETS
Built 2014
MSAS 235 over MISS R; RR; STRS
Built 1996
MSAS 235 over MISS R; RR; STRS
Built 1996
Bridge Details
- Structure #
- 62026
- Year Built
- 1965
- Reconstructed
- 2010
- Length
- 176.9 m (580.4 ft)
- Max Span
- 46.2 m
- Width
- 31 m (101.7 ft)
- Lanes
- 6
- Daily Traffic
- 66,460
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.