MN 51 over BNSF RAIL; SERVICE RD

1.2 MI N OF JCT TH 12 · County 123, Minnesota · Built 1965 · 6 Lanes · 34,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
62014
Year Built
1965
Length
61.6 m (202.1 ft)
Max Span
19.4 m
Width
28.4 m (93.2 ft)
Lanes
6
Daily Traffic
34,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$244,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.