MN 58 over STREAM

1.8 MI N OF JCT CSAH 3 · County 049, Minnesota · Built 1931 · 2 Lanes · 3,182 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
6170
Year Built
1931
Length
10.2 m (33.5 ft)
Max Span
3.2 m
Lanes
2
Daily Traffic
3,182
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$256,000,000
Total Project Cost
$234,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.