US 52 over PINE ISLAND CREEK

2.0 MI S OF S JCT TH 60 · County 049, Minnesota · Built 1960 · 6 Lanes · 28,281 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
6130
Year Built
1960
Length
9 m (29.5 ft)
Max Span
4.1 m
Lanes
6
Daily Traffic
28,281
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.