CSAH 21 over GRAND MARAIS CR
1.0 MI E OF JCT CSAH 64 · County 119, Minnesota · Built 2024 · 2 Lanes · 163 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
48.020772, -97.023314
This bridge is in worse condition than 68.4% of bridges in County 119. The average bridge in Minnesota is 0 years old; this one is 2 years old.
Nearby Bridges
MN 220 over GRAND MARAIS RIVER
Built 1983
T 327 over Grand Marais Creek
Built 2002
MN 220 over CO DITCH # 2
Built 2017
T 423 over CO DITCH # 2
Built 1997
COUNTY ROAD over SOUTH MARIAS RIVER
Built 1926
CSAH 65 over GRAND MARAIS RIVER
Built 1969
CSAH 64 over GRAND MARAIS STATE DITCH
Built 1974
T 421 over CO DITCH # 2
Built 1992
CSAH 64 over GRAND MARAIS
Built 2013
COUNTY HIGHWAY over SOUTH MARAIS RIVER
Built 1984
Bridge Details
- Structure #
- 60L56
- Year Built
- 2024
- Length
- 13.9 m (45.6 ft)
- Max Span
- 4.3 m
- Lanes
- 2
- Daily Traffic
- 163
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.