T 300 over STREAM

0.2 MI W OF JCT TH 75 · County 119, Minnesota · Built 2004 · 2 Lanes · 40 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
60K44
Year Built
2004
Length
7.1 m (23.3 ft)
Max Span
3 m
Lanes
2
Daily Traffic
40
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$52,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.