T 861 over MAPLE CREEK

0.5 MI S OF JCT CSAH 51 · County 119, Minnesota · Built 1999 · 2 Lanes · 12 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
60J30
Year Built
1999
Length
9.1 m (29.9 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
12
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.